date | name | report | remarks |
2024-07-18 |
HALO-0718 |
|
- EMI Flight
- icing on boilerroom window shortly after start
|
2024-07-30 |
HALO-0730 |
|
- Test flight
- some icing on polc
- restart of SLS at 10:09 UTC, measurements running again at 10:39 UTC
|
2024-08-09 |
HALO-0809 |
|
- Transfer flight HALO-20240809ab
- a: Oberpfaffenhofen (EDMO) - Memmingen (EDJA)
- b: Memmingen (EDJA) - Sal (GVAC)
- some icing on the polc (looking to the right in flight direction
|
2024-08-11 |
HALO-0811 |
|
- First local flight (Sal) HALO-20240811a
- Measurements of the boileroom part of specMACS paused for about 30 min shortly after takeoff
- Icing on the side cameras
|
2024-08-13 |
HALO-0813 |
|
- Second local flight (Sal) HALO-20240813a
- Measurements of the boilerroom part of specMACS started later (approx. 20 min after takeoff) because the temperature was above the operating limit of the spectral cameras
- no SWIR darkcurrent measurements until around 17:40 UTC
- Stopped measurements before landing due to darkness
- Some icing on the polc right before sunset
|
2024-08-16 |
HALO-0816 |
|
- Third local flight (Sal) HALO-20240816a
- Measurements of the boileroom part of specMACS paused for about 15 min shortly after takeoff
|
2024-08-18 |
HALO-0818 |
|
- Fourth local flight (Sal) HALO-20240818a
- icing on the sideward looking cameras (polc and pold)
|
2024-08-21 |
HALO-0821 |
|
- 5th local flight (Sal) HALO-20240821a
- icing on side cameras, first polc, later also pold
|
2024-08-22 |
HALO-0822 |
|
- 6th local flight (Sal) HALO-20240822a
- measurements in boilerroom part stopped after takeoff because of temperature issues for about 6 min
- some icing on polc
|
2024-08-25 |
HALO-0825 |
|
- 7th local flight (Sal) HALO-20240825a
- very little icing on polc
|
2024-08-27 |
HALO-0827 |
|
- 8th local flight (Sal) HALO-20240827a
- icing on both side cameras
- three Meteor overpasses
- King Air overpasses at 16:53:53 UTC and 17:15:16
|
2024-08-29 |
HALO-0829 |
|
- 9th local flight (Sal) HALO-20240829a
- measurements on SDA started about 20 min after takeoff because of temperature
- icing on polc pold when flying through a large anvil cloud
|
2024-08-31 |
HALO-0831 |
|
- 10th local flight (Sal) HALO-20240831a
- ATR overpass at about 16:15 UTC
|
2024-09-03 |
HALO-0903 |
|
- 11th local flight (Sal) HALO-20240903a
- some icing on polc
|
2024-09-06 |
HALO-0906 |
|
- transfer flight to Barbados - HALO-20240906a
- come condensation on polc
|
2024-09-07 |
HALO-0907 |
|
- 1st local flight (Barbados) - HALO-20240907a
- Measurements in the boilerroom started about 10 min after takeoff
- some icing on side cameras, mainly polc
|
2024-09-09 |
HALO-0909 |
|
- 2nd local flight (Barbados) - HALO-20240909a
- start measurements of all cameras just after takeoff to save disk space
- some icing on side cameras
- measurements in boilerroom stopped a little bit before landing when water was runnning over window
|
2024-09-12 |
HALO-0912 |
|
- 3rd local flight (Barbados) - HALO-20240912a
- low surface wind speeds
- non-initialized restart of camserver on SDA during flight
|
2024-09-14 |
HALO-0914 |
|
- 4th local flight (Barbados) - HALO-20240914a
- measurements in boilerroom started shortly after takeoff
- icing on sideward cameras after cirrus clouds
|
2024-09-16 |
HALO-0916 |
|
- 5th local flight (Barbados) - HALO-20240916a
- still some measurements from apron
- measurements in boilerroom started about 10 min after takeoff
- PACE underpass at around 16:14 UTC
- METEOR overpass at about 17:25 UTC
- SLS restart at about 19:05 UTC, VNIR missing after restart, so SDA started again. Measurements finally running again around 19:27 UTC
|
2024-09-19 |
HALO-0919 |
|
- 6th local flight (Barbados) - HALO-20240919a
- measurements of boilerroom part started shortly after takeoff
- METEOR overpasses at 12:25 UTC and 13:46 UTC
- on PACE track from 15:40 UTC, underpass around 16:23 UTC
|
2024-09-21 |
HALO-0921 |
|
- 7th local flight (Barbados) - HALO-20240921a
- measurements in boilerroom started about 15 min after takeoff
- doldrums
|
2024-09-23 |
HALO-0923 |
|
- 8th local flight (Barbados) - HALO-20240923a
- quite some apron measurements
- boilerroom measurements started about 20 min after takeoff, manually open SWIR shutter
- METEOR overpass at around 12:25 UTC
|
2024-09-24 |
HALO-0924 |
|
- 9th local flight (Barbados) - HALO-20240924a
- start with all cameras running, some runway/apron measurements
- ice on side cameras
|
2024-09-26 |
HALO-0926 |
|
- 10th local flight (Barbados) - HALO-20240926a
- measurements of boilerroom part started about 10 min after takeoff
- no dark current measurements of SWIR?
- icing of side cameras, first pold then polc
|
2024-09-28 |
HALO-0928 |
|
- 11th local flight (Barbados) - HALO-20240928a
- attention: during this flight time synchronization with the BAHAMAS time server was not possible due to network problems of the time server. This may impact the georeferencing and analysis of the data!
- start of boilerroom measurements about 10 min after takeoff
- no dark current measurements of SWIR?
- some icing on pold
|
2024-09-29 |
HALO-0929 |
|
- transfer flight Barbados - Oberpfaffenhofen - HALO-20240929a,b
- a: Barbados (BGI) - Memmingen (EDJA)
- b: Memmingen (EDJA) - Oberpfaffenhofen (EDMO)
- measurements of boilerroom started shortly after takeoff
- 23 UTC: measurements of all cameras stopped due to darkness
- measurements restarted around 04:42 UTC
- no measurements from Memmingen to Oberpfaffenhofen
|
2024-11-05 |
HALO-1105 |
|
- first flight from Oberpfaffenhofen
|
2024-11-07 |
HALO-1107 |
|
- second flight from Oberpfaffenhofen
|
2024-11-10 |
HALO-1110 |
|
- third flight from Oberpfaffenhofen
|
2024-11-12 |
HALO-1112 |
|
- fourth flight from Oberpfaffenhofen
|
2024-11-14 |
HALO-1114 |
|
- fifth flight from Oberpfaffenhofen
|
2024-11-16 |
HALO-1116 |
|
- sixth flight from Oberpfaffenhofen
|
2024-11-19 |
HALO-1119 |
|
- seventh flight from Oberpfaffenhofen
|